New Build Installation
When you're designing a new tank or covered lagoon, the cleanest path to the Bristola system is to spec the entry portal at the design stage. Our engineers coordinate directly with your fabricator and contractor so the portal is integrated into the new facility from day one.
What New Build Installation is
When you're designing a new tank or covered lagoon, the cleanest path to the Bristola system is to spec the entry portal at the design stage. Our engineers coordinate directly with your fabricator and contractor so the portal is integrated into the new facility from day one.
What you get
- Design-stage integration with your fabricator
- Single installation window during construction
- Lowest total cost vs. retrofit-later
- Engineering & documentation handed to your operator team
- Smooth transition into the cleaning + monitoring contract
- US & Canada delivery
Where it fits
The Bristola system was designed for facilities across the United States and Canada — wastewater treatment plants, renewable-energy biogas digesters, food & beverage processing, oil & gas, pulp & paper, and other industrial liquid storage. Installation Services fits into the full Bristola engagement: feasibility study, install, cleaning intervals, and ongoing condition monitoring.
Other installation services options
Ready to discuss your facility?
A Bristola engineer will walk you through new build installation for your specific tank or covered lagoon.